Skip to content

FL license CCC1335466South & Central Florida

Miami-Dade County · High-Velocity Hurricane Zone

Roofing in Cutler Bay, FL

Cutler Bay is a town of 1950s-to-1980s subdivisions (Cutler Ridge, Bel Aire, Saga Bay, Lakes by the Bay) that sat in Hurricane Andrew's worst damage zone in 1992.

FL Certified Roofing Contractor CCC1335466

A post-Andrew study of seven South Dade subdivisions, including Lakes by the Bay and Saga Bay, became a basis for the revision of the South Florida Building Code. Today the Town runs its own Building Division, applies a 44% substantial-damage rule in its flood-prone areas, and limits owner-builder re-roofs to shingle and peel-and-stick. If your roof dates from the post-Andrew rebuild, it is now more than 30 years old.

Your roof in Cutler Bay at a glance

Who issues roof permits
Town of Cutler Bay Community Development Department (Building Division)1,2,3

Re-roof permits go through the Town's Building Division at Town Center, 10720 Caribbean Blvd., Suite 110, with status and inspections tracked in the Town's online permit services. Online records start August 1, 2010; for older permits, call the Building Department at (305) 234-4193.

Code that governs
Florida Building Code, 8th Edition (2023), including the High-Velocity Hurricane Zone (HVHZ) chapters
Product approval
Miami-Dade NOA, or a Florida Product Approval listed for HVHZ use, for every roof component.
Design wind speed
Miami-Dade sits in the High Velocity Hurricane Zone (HVHZ). Florida Building Code 8th Edition (2023) section 1620.2 sets one design wind speed for the whole county instead of a map range: 175 mph (3-second gust) for homes and other Risk Category II buildings, and 186 mph for Risk Category III.4,5
Homes
Median home built in 1984. 66.8% of 15,074 homes were built before 2000; 65.8% are detached single-family houses.6
Neighborhoods
Cutler Ridge · Saga Bay · Lakes by the Bay · Bel Aire · Whispering Pines · Holiday House

What is on the roofs in Cutler Bay

Most of Cutler Bay is postwar subdivisions. David Blumberg platted Cutler Ridge Section One in 1954 and added sections through 1958; Bel Aire grew by 23 sections between 1957 and 1978; Saga Bay was platted in 1972; Lennar started Lakes by the Bay in 1983. Andrew's worst damage in 1992 ran from Kendall south through Homestead, which takes in all of these neighborhoods, so many of these houses carry roofs from the rebuild or later.7,8

Local rules and history that affect your roof

  • Residents voted to incorporate in January 2005, approved the Town Charter on November 8, 2005, and Cutler Bay became a municipality the next day, then the youngest in Florida.7
  • After Andrew, forensic engineers studied seven South Dade subdivisions for the Miami-Dade Building Department, including Lakes by the Bay and Saga Bay. Their findings on code violations and construction defects became a basis for revising the South Florida Building Code.9
  • The Town's re-roof checklist asks for the permit application, two copies of the contractor's roofing package and two of the NOA, plus an up-front review fee. Owner-builder re-roof permits are allowed only for shingle and peel-and-stick roofs.3
  • If an old roofing permit on your house was never closed, the Town has a Roofing Inspector Report form: an independent inspector with no ties to you or the original roofer certifies the roof's condition and lists any deficiencies to correct.10
  • Cutler Bay sits on low ground beside Biscayne Bay, and the Town lists storm surge, flash flooding and canal overflow as its flood sources. It applies a 44% rule: if a building is damaged or improved by more than 44% of its market value, it must meet current floodplain requirements, which matters after a major storm repair.11
  • The Cutler Ridge, an old limestone formation, runs through Town at about 14 feet above sea level. Hurricane plans treat land east of the ridge as exposed to storm surge, while land west of it is generally protected.12

Storms that hit here

  • Andrew (1992). On August 24, 1992, Andrew's impact was extreme from Kendall south through Homestead, and the National Hurricane Center's damage photos include Lakes by the Bay. Photos in that set also show Naranja Lakes and Homestead.8
  • Katrina (2005). Less than three months before incorporation, Katrina crossed Miami-Dade as a Category 1 and soaked the south end of the county: a South Florida Water Management District gauge at Cutler Ridge recorded 11.13 inches of rain.13

What this means for a re-roof in Cutler Bay

How old the houses are. The median home in Cutler Bay was built in 1984; 66.8% of its 15,074 homes predate 2000 and 7.3% were built in 2010 or later. So most houses here went up before Florida’s first statewide building code took effect on March 1, 2002.6,14,15,16

Pre-2002 wood-deck houses. When the old covering comes off, the deck gets re-nailed to current code and a secondary water barrier goes on; in the wind-borne debris region, insured homes of $300,000+ may also need roof-to-wall connections (capped at 15% of the re-roof cost).14,15,16

Repair or replace. Replacing 25% or more of a roof section in 12 months generally means redoing the section to current code — unless that roof was built or replaced under the 2007 code or later.15,16,17,18

Product approval. In the HVHZ every roofing component needs a current product approval — a Miami-Dade NOA or a Florida approval listed for HVHZ use. Ask for the numbers and look them up yourself.17,19

Roof age and insurance. An insurer can’t refuse a policy just because the roof is under 15 years old. If it is 15 or older, you can get an inspection first; at least 5 years of remaining life means age alone isn’t grounds to refuse.20

Nearby areas

Sources

Facts on this page come from these public sources. Last checked September 2026.

  1. 1.Building Division — Town of Cutler Bay
  2. 2.Permits and Inspections — Town of Cutler Bay
  3. 3.Re-Roofing Permit Checklist — Town of Cutler Bay Building Division
  4. 4.2023 FBC Building, 8th ed., Section 1620 High-Velocity Hurricane Zones — Wind Loads — UpCodes (Florida Building Code text)
  5. 5.Benchmarks set for code-related approval of building products — Miami-Dade County
  6. 6.American Community Survey 2020–2024 5-year estimates (tables B25035, B25034, B25024, B25003) — U.S. Census Bureau, via Census Reporter
  7. 7.Development of Cutler Bay — Town of Cutler Bay
  8. 8.Preliminary Report: Hurricane Andrew — NOAA National Hurricane Center
  9. 9.Top Ten Florida Residential Building Code Violations (Cox, Issa & Ligator, University of Florida, 2006) — Florida Building Commission / DBPR
  10. 10.Roofing Inspector Report (to close old permits) — Town of Cutler Bay Building Division
  11. 11.Flood Awareness — Town of Cutler Bay Public Works
  12. 12.Cutler Bay, Florida (History and Geography; citing FEMA, NWS Natural Disaster Survey Report and Miami Herald) — Wikipedia
  13. 13.Tropical Cyclone Report: Hurricane Katrina (AL122005) — NOAA National Hurricane Center
  14. 14.Florida Building Code Effective Dates — Florida Building Commission (floridabuilding.org)
  15. 15.2023 Florida Building Code, Existing Building, 8th ed., Chapter 7 (Section 706 Existing Roofing) — UpCodes (text of the Florida Building Code)
  16. 16.Florida Statutes 553.844, Windstorm loss mitigation; requirements for roofs and opening protection (2026) — Florida Legislature
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 15 Roof Assemblies and Rooftop Structures (Sections 1511-1525) — UpCodes (text of the Florida Building Code)
  18. 18.SB 4-D (2022 Special Session D): Building Safety, Chapter 2022-269 — The Florida Senate
  19. 19.Product Control Search — Miami-Dade County
  20. 20.Florida Statutes 627.7011 (2026): Homeowners' policies; offer of replacement cost coverage and law and ordinance coverage — The Florida Legislature
Call 305-209-0247Free inspection